This is the biggest jack-hammer I've ever seen. With more of the
demolition debris out of the way, they are breaking up some of the
concrete. These round concrete posts are being broken up for
disposal. When the operator presses down with the point, it makes a slow
rat-a-tat and quickly breaks through. He can then use the point like a
finger to flick the pieces away.
As I understand it, the EPA will
not remove all of the concrete from the site, only what they have to
move to get at the contamination and make the site safe.
|