All of the concrete broken up and removed during the demolition is in two huge, long piles on the slab out back. There are tons of it. Every day large dump trucks are moving it from the site out to these piles. You can see the piles of concrete from Main Street but they show up best from the St. Albans Road (Pleasant Street). In the next week or two, a concrete crusher will be brought onto the site. This material will be crushed to make fill.

If you look carefully, you will see workers moving through the piles with cutting torches. They are removing the re-bar sticking out of the pieces.

While taking these pictures an occasional clang could be heard as the removed re-bar was tossed out onto the ground.

   