August 11, 2001 |
The preparation of the new river channel continues. This picture of the south bank, just below the new bridge, shows some of the extensive work on the banks and river bed. A new drainage system has been installed and the banks have been conditioned. For more information on the cleanup, check out the Weston Update below. |