November 29, 2002
|
This is the view looking up stream from the former mill location. A sloping lawn now leads down to the East Branch of the Sebasticook River just above the Route 7 bridge. The soil and water treatment facilities show in the background on the left bank of the river. These structures are temporary. They will be removed in a year or two, after the soil treatment process is complete. A permanent water pumping and treatment facility will be constructed later on. |