Down
behind the hill, where the new section of the mill used to be, the EPA has
erected this temporary building. It has a metal frame, bolted to the
concrete slab. The roof and side walls are made of a thick, tough material
stretched and fastened to the frame. The enclosure will eventually house
the condensers and filtering equipment used to capture the contamination
removed from heated soil. The initial soil decontamination work will begin
next week.
|