November
21, 2001 |
This is a picture of the new riverbed, upstream of the Route 7 bridge (center). The channel crosses the former mill location and connects into the old mill pond area. Winter and Spring runoff will follow this channel. The Area 1 excavation is on the other side of the right bank. |