July 6, 2002
|
Here is an aerial photo of the slab where the newest section of the mill was located before it's demolition in 1999. The long black structure near the top is the first of four soil decontamination beds to be constructed. This one is presently operating and being carefully monitored as a pilot study for the project. The blue and gray tanks to the right trap the chlorobenzene compounds removed from the soil. For more details on the decontamination process, click these links to view the pages posted for June 17, June 18 and June 19. |